IB&M’s mechanical services & piping group was selected for the Mohawk / IVC plant expansion in Dalton, GA. The state-of-the-art flooring facility will be responsible for the manufacturing of sheet vinyl, luxury vinyl tile (LVT) and laminates for the U.S market.
Notable project highlights include:
- design and installation of a rooftop HVAC system requiring roughly 4000 feet of ductwork
- installation of eight octagonal air distribution ducts used to distribute controlled air to the manufacturing plant
- installation of two chillers and three cooling towers
- thermal fluid heater installation
- process piping installation using lines up to 36” in diameter for thermal fluid, air, water, chilled water, natural gas and process liquids for the plant
To complete their portion of the project, IB&M managed an on-site team of up to 60 people working 12 hours a day, seven days a week over a six month period.