| Summer 2005 |
|
IB&M was awarded a major project to completely rebuild two coal fired field erect powerhouse boilers for a major southeastern university. IB&M was awarded this project due to it's capability to complete this major project in the required short time frame of two months.
|
|
| Summer 2005 |
|
Installation of three 70,000 lb/hr rental boilers to provide steam supply to plant for outage of existing powerhouse boilers. These three watertube boilers were installed in 5 days.
|
| Summer 2005 |
|
IB&M provided and installed a new 350 HP rental boiler from stock for a emergency outage due to a major boiler failure . IB&M shipped, installed and provided start-up on this boiler getting the plant back into production within 16 hours.
|
| Summer 2005 |
|
Provided a 700 HP rental boiler from stock for emergency plant shut down due to a major boiler failure. IB&M had the rental boiler shipped, installed and started up within 24 hours.
|
| Summer 2005 |
|
Completely retubed a 1200 HP boiler at a major poultry refinery in middle Georgia.
|
| Summer 2005 |
|
Sell of new 40,000 lb/hr B&W Watertube boiler. This new system is designed to burn natural gas, # 2 fuel oil and land field gas which will be pulled from a near by land field.
|
| Spring 2005 |
|
Complete retube of Nebraska 40,000 lb/hr watertube boiler. This project included all tubes, casing and insulation.
|
| Spring 2005 |
|
Sold and installed complete new boiler plant which included (2) new 700 HP Hurst boilers, economizers, linkage less Control system, all related piping and system start-up.
|
| Spring 2005 |
|
Sold and installed complete new boiler plant which included (2) new 700 HP Hurst boilers, economizers, linkage less Control system, all related piping and system start-up.
|
| Spring 2005 |
|
Provided complete controls & instrumentation replacement on 3 watertube boilers in middle Georgia.
|
| Winter 2004 |
|
Sold new 40,000 Lb/Hr B&W watertube boiler for plant process in Costa Rica. IB&M performed start-up and System calibration for new system.
|
| Fall 2004 |
|
Built (3) complete package boiler systems mounted in sea containers. Each system consisted of package boiler, feedwater system, reverse osmosis system, water softener, gas detection system, all electrical and interconnecting piping. After completion of fabrication, these units were shipped to Eastern Russia for an oil platform application.
|
| Summer 2004 |
|
Provided labor, materials and expenses to replace the total control systems on three large process boilers. IB&M provided new Fireye Nexus linkage-less servo driven systems with continuous O2 monitoring and control.
|
| Summer 2004 |
|
Provided labor, material and expenses to remove 750 HP package boiler from a sister plant in Dalton, completely rebuilt boiler at our Chattanooga shop facilities including all new tubes and relocated to Trenton for installation and start-up by IB&M.
|
| Summer 2004 |
|
Provided labor, material and expenses to completely retube a 60,000 lb/hr B&W watertube process boiler.
|
| Summer 2004 |
|
Provided complete controls & instrumentation replacement on 5 watertube boilers at a poultry facility in middle Alabama.
|
| Spring 2004 |
|
Sale, installation and start-up of a new Hurst 400 HP 4-pass wet back package boiler.
|
| Winter 2003 |
|
Provided engineering and on site service to redesign heavy oil burner system and necessary modifications on high pressure watertube boiler.
|
| Winter 2003 |
|
Sale of new 1500 HP Hurst 4-Pass wet back high pressure firetube boiler.
|
| Fall 2003 |
|
Sale , installation and start-up of 60 million BTU/HR air mixed propane system and two 30,000 gallon bulk storage liquid propane tanks.
|
| Fall 2003 |
|
Sale of new 900 HP Hurst 4-Pass wet back boiler and economizer system.
|
| Summer 2003 |
|
Sale and installation of complete 60,000 lb/hr watertube boiler system including DA system, water softener system, condensate storage system.
|
| Summer 2003 |
|
Sale and installation of new BFS Deaerator system for two 700 HP firetube boilers.
|
| Spring 2003 |
|
Provided and installed two new IC burner systems on existing 900 HP Johnston boilers. This conversion included a new Servo drive control system installation and start-up.
|
| Spring 2003 |
|
Installation of new 60,000 lb/hr B&W watertube boiler and new DA system.
|
| Winter 2002 |
|
Rebuild of ash hopper system for 120,000 lb/hr B&W field erect power boiler system.
|
| Winter 2002 |
|
Sale, installation and start-up of Alternate Energy air mixed propane system and two bulk storage tanks.
|
| Fall 2002 |
|
Complete retube of high pressure watertube process boiler.
|
| Summer 2002 |
|
Fabrication and installation of precipitator duct system on power boiler system.
|
| Summer 2002 |
|
Installation and start-up of two new firetube boilers including removal of existing boiler system. This project was completed without interrupting plant process providing steam to plant with no down time.
|
| Summer 2002 |
|
Sale, installation, and start-up of Alternate Energy 50 million btu propane system and storage tanks.
|
| Summer 2002 |
|
Installation of new plant steam process piping which included control valves and accumulator system.
|
| Spring 2002 |
|
Sale and installation of new 400 HP firetube boiler system including new DA, water softeners, and chemical feed System. This system was installed with a low nox burner burner system and variable frequency drive system.
|
| Spring 2002 |
|
Sale and installation of new steam plant consisting of removal of two Cleavers Brooks watertube boilers and installation of two new 1500 HP firetube boilers. This project also included providing and installing new Low Nox burner systems with variable frequency drives and a new servo driven control system designed by IB&M.
|
| Winter 2001 |
|
Complete rework of 6 Autoclaves, which included replacement of vessel shell sections, rework on door flange seal surfaces and new conveyer track systems.
|
| Winter 2001 |
|
Complete replacement of tubes in two heat recovery boilers.
|
| Fall 2001 |
|
Provided onsite construction for $ 477 million dollar power plant. IB&M’s involvement consisted of fabrication of 2300 psi P-22 power piping, fabrication of drum headers, preparation and rework of boiler generator tubes, alteration of pressure vessel components, and on site maintenance contract once plant went online.
|
| Summer 2001 |
|
Provide boiler, installation and start-up of complete 70,000 lb/hr, 350 psi watertube boiler for new paper manufacturing facility.
|
| Summer 2001 |
|
Burner rebuild, casing replacement and ash hopper replacement of 120,000 lb/hr B&W field erect boiler.
|
| Spring 2001 |
|
Replacement of superheater tubes, generating tubes, and tube shields in 120,000 lb/hr B&W power boiler.
|
| Spring 2001 |
|
Replacement of superheater tubes, generating tubes, and tube shields in 120,000 lb/hr B&W power boiler.
|
| Spring 2001 |
|
Provide and install two new IC burners and new servo drive control system on two Keeler 30,000 lb/hr watertube boilers.
|
| Winter 2001 |
|
Complete retube of 50,000 lb/hr Nebraska watertube boiler. This included new front wall refractory, casing and insulation.
|
| Fall 2000 |
|
Provided and installed new front waterwall on 73,000 lb/hr watertube boiler. This included remove of refractory wall and installation of a newly designed waterwall which required alteration to both steam and mud drums with new header distribution for proper circulation.
|
| Fall 2000 |
|
Provided 1000 HP firetube boiler and DA.
|
| Fall 2000 |
|
Provided labor, materials and expenses to replace tubes, casing and refractory for Babcock & Wilcox Auxiliary Boiler.
|
| Summer 2000 |
|
Provided and installed (2) Alternate Energy Aerated Propane plants which includes 180,000 gallons of bulk storage and provides over 425 million btu’s per hour of back up fuel on a much more attractive curtailed rate natural gas opposed to the more expensive fixed rate fuel.
|
| Summer 2000 |
|
Provided labor, materials and expenses to install AutoFlame Control System on a 3 boiler system configured to burn 4 different types of fuel.
|
| Summer 2000 |
|
Provided complete 1000 HP Boiler plant for major plant expansion.
|
| 1999 - 2000 |
|
Provided labor, materials and expenses to completely rebuild 120,000 lb/hr power Babcock & Wilcox field erected utility boiler. This unit was 5 stories tall and included all tubes,refractory and casing. This was a one year project which required 22,000 man hours.
|
| Fall 1998 |
|
Complete rebuild of 72,000 lb/hr Watertube Rental Boiler including all tubes, refractory, and casing. Project completed in our Chattanooga Plant.
|
| Summer 1998 |
|
IB&M received contract to build a total of 72 stainless steel batch mixing tanks and mixers.
|
| Summer 1998 |
|
Provided and installed two boilers for new plant expansion. This project also included process piping and system start up.
|
| Summer 1998 |
|
Sold and installed 700 HP Boiler, new 30,000 lb/hr Lockwood D.A. system, new water softener system and steam highline piping to main processing plant.
|
| Spring 1998 |
|
Sold and installed new 60,000 lb/hr Nebraska Watertube Boiler and start up. This project also included supplying an IB&M 700 HP Rental Boiler on site for six months to maintain plant production.
|
| Fall/Winter 1997 - 1998 |
|
Provided labor, materials and expense to completely rebuild 150,000 lb/hr Combustion Engineering Watertube Boiler. Project consisted of replacement of all tubes, install new rear refractory rear wall and provide and install new casing.
|
| January 1998 |
|
Provided labor, materials and expense to remove existing refractory front wall and install new design "waterwall" front wall in 73,000 lb/hr Tampella Power Boiler.
|
| January 1998 |
|
Provided and installed new 60 million btu/hr Waterbath Propane System with 30,000 gal. propane bulk storage tank. This system was provided as "turn key" with all underground piping connecting to city gas main outlet, transfer pumping station, truck loading station and start up by IB&M.
|
| Winter 1998 |
|
Provide new 150 H.P. High Pressure Boiler System including new 20,000 lb/hr D.A. System installation and start up.
|
| Winter 1997 |
|
Provided and install new 15 million btu/hr Hot Oil Heater System including expansion tank, circulation pumps and process piping plant equipment. Also provided and installed new 300 H.P. boiler system including all new auxiliary equipment and start up provided by IB&M.
|
| Fall 1997 |
|
Provide labor, materials and expenses to completely replace firebox water leg in 400,000 lb/hr Coal Fired Boiler.
|
| Summer 1997 |
|
Provide labor, materials and transportation to relocate 80,000 lb/hr Nebraska Boiler and 100,000 lb/hr Industrial Boiler D.A. System. System was installed and started up by Industrial Boiler & Mechanical Co.
|
| Winter 1996 - 1997 |
|
Provide labor, materials and expense to rebuild 225,000 lb/hr Combustion Engineering Boiler. After firebox explosion work included boiler tubes, and refractory. All boiler casing, economizer, flue gas recirculation system and exhaust breeching. Total of 9000 safe man hours.
|
| Summer 1996 |
|
Complete retube and rebuild on 60,000 lb/hr Nebraska Watertube Rental Boiler including all tubes, refractories, casings, and paint.
|
| Summer 1996 |
|
Provide and install 63,000 lb/hr B&W Package Watertube Boiler.Economizer and Lockwood D.A. System.
|
| Spring 1996 |
|
Complete Retube and rebuild on 73,000 lb/hr Tampella Power Watertube Rental Boiler including all tubes, refractories, casings and paint.
|
| Winter 1995 |
|
Provide and install new 60,000 lb/hr Lockwood D.A. system.
|
| Winter 1995 |
|
Fabrication & Design of (4) new firetube package boilers with design pressure of 200 psi.
|
| Winter 1995 |
|
Retube and front wall replacement on 55,000 lb/hr B&W watertube boiler including boiler casing and control system update.
|
| Winter 1995 |
|
Replacement of all "D" tubes and screenwall tubes and new casing on 50,000 lb/hr Cleaver Brooks Watertube Boiler.
|
| Winter 1995 |
|
Partial retube and front wall replacement of 50,000 lb/hr Nebraska watertube boiler.
|
| Winter 1995 |
|
Provide and install 500 HP Cleaver Brooks Boiler with all boiler auxillary equipment.
|
| Winter 1995 |
|
Provide fabrication and installation of coal elevators to provide coal to (2) coal fired process boilers.
|
| Winter 1995 |
|
Provided and installed 60,000 lb/hr Nebraska Rental Boiler completed in 2 days to get customer back in production due to boiler failure.
|
| Winter 1995 |
|
Provide and install 60,000 lb/hr Nebraska watertube boiler with conversion to Low Nox operation of less than 50 ppm
|
| Fall 1995 |
|
Provide, install and start-up 148,000,000 BTU Ely Energy Propane System including 30,000 gallon storage tanks, water bath vaporizer, surge tank and mixed gas plant piping.
|
| Fall 1995 |
|
Provide and install 700 HP Cleaver Brooks Boiler System with new45,000 lb/hr D.A. System.
|
| Fall 1995 |
|
Provide and install 300 HP woodfired boiler system.
|
| Fall 1995 |
|
Sale and install new Ermco water softner system in order to provide 2,000,000 gallons of process softened water per day.
|
| Fall 1995 |
|
Sale of (2) 800 HP Cleaver Brooks Firetube Boilers with 100,000lb/hr CB D.A. System with all boiler plant auxiliary equipment.
|
| Summer 1995 |
|
Provide and start-up of 300,000 lb/hr high pressure Lockwood D.A. system to provide feedwater to boilers 1/4 mile away.
|
| Summer 1995 |
|
Provided and install new 900 HP Johnston Boiler and 60,000 lb/hr Lockwood D.A. System over July 4th shutdown.
|
| Spring 1995 |
|
Complete replacement of inner and outer water wall on CNB tri-fuel 600 HP Boiler
|
| Spring 1995 |
|
Installed 30,000 lb/hr Zurn rental boiler in order to make necessary major repairs on (2) 50,000 lb/hr Cleaver Brooks Boilers
|
| Winter 1994 |
|
Installed and start-up on 75,000,000 BTU Ely Energy Propane System including 30,000 Gal. storage tank,water bath vaporizer, surge tank and mixed gas plant piping.
|
| Winter 1994 |
|
Installed Ludell Hot water heater system and process piping in plant.
|
| Winter 1994 |
|
Provided and installed 100,000 lb/hr Cochran D.A. system for (2) B&W water tube boilers.
|
| Winter 1994 |
|
Provided labor and materials to completely retube (2) 1,000 HP Coal Fired Boilers in which both boilers were completed in a one week shut down period.
|
| Winter 1994 |
|
Installed 75,000,000 BTU Ely Energy Propane System including 30,000 gallon storage tank, water bath vaporizer,surge tank and mixed gas plant piping.
|
| Fall 1994 |
|
Provided and installed 400 HP wood Gasification including silo's, building, wood transfer system, dust collector system, boiler system and process piping.
|
| January 1994 |
|
Complete rebuild on a Cleaver Brooks Watertube D-52 including tubes, casing and refractory
|
| January 1994 |
|
Our Technical Service Dept. set new record crossing over the 100 mark for boilers per month on monthly service contracts
|
| December 1993 |
|
Provided and installed 700 HP Cleaver Brooks boiler and feedwater system with start-up.
|
| Winter 1993 |
|
Relocated 60,000 lb/hr Cleaver Brooks Watertube Boiler from Sony Music in Carrolton to Lyerly Plant installed boiler and economizer and provided start-up.
|
| Fall 1993 |
|
Provided fall outage work on (2) 160,000 lb/hr Babcock and Wilcox Boilers. This outage included tube section replacement on main generator bank, waterwall, tubes and economizer.
|
| Fall 1993 |
|
Installation of 120,000 lb/hr Crane Cochrane DA and pump system. Providing feedwater to four watertube boilers.
|
| Summer 1993 |
|
Provided and install 300 psi International watertube boiler and feedwater system over week of July 4th. This included removal of old boiler system and start-up.
|
| Summer 1993 |
|
Provided and installed 30,000 lb/hr rental boiler to provide steam service to plant while we rebuilt (2) Keeler 30,000 lb/hr watertube boilers including all inner/outer casing, front and rear refractory walls.
|
| Spring 1993 |
|
Complete rebuild on three package watertube boilers including all tubes, casing, front & rear refractory walls
|
| Winter 1993 |
|
Provided and installed Cleaver Brooks 35,000 lb/hr watertube boiler and 70,000 lb/hr. Cleaver Brooks Spray-Master Deaerator
|
| Fall 1992 |
|
Complete retube on 700 hp steam boiler |
| Summer 1992 |
|
Our Technical Service Dept. received the largest service contract ever released from Shaw to provide combustion service at 35 manufacturing plants each month.
|
| Summer 1992 |
|
Designed, provided and installed Central steam energy plant consisting of (2) 35,000 LB/HR Combustion Engineering field erected Boilers and (1) B&W 50,000 lb/hr Gas fired back up boiler. This plant supplied steam produced by sawdust to two manufacturing plants. Total high line piping is approx 4200 feet.
|
| Summer 1992 |
|
Complete retube on 50,000 lb/hr watertube boiler. Including front wall, new rear wall tube design and new casing drain design.
|
| Spring / Summer 1992 |
|
Complete renovation of prison power house. This renovation consisted of removal of (4) gas 35,000 lb/hr Combustion Engineering field erected Boilers and three 2.5 Mega Watt Worthington Turbine Generators and related equipment.Installed two 800 H.P. and two 300 H.P. Superior Firetube Boilers. Also installed two 30,000 gallon fuel oil storage tanks and retaining dike.
|
| Spring 1992 |
|
Provided and installed Combustion Engineering 35,000 lb/hr Package Boiler. Tied steam system into existing triple boiler system to serve as primary boiler.
|
| Winter 1992 |
|
Sold 110,000 lb/hr. Industrial Watertube package boiler.
|
| Fall 1991 |
|
Provided and installed new 600 H.P. Cleaver Brooks boiler system.
|
| Summer 1991 |
|
Provided and installed emergency installation of 600 H.P. Cleaver Brooks Boiler and related equipment. Also installed 300' pipe highline which included steam, gas, oil, feed water piping and electrical. This complete project was done in 4 days
|
| Summer 1991 |
|
Provided and installed asphalt emulation plant which included 19 process tanks, steam boiler, all steam and process piping.
|
| Summer 1991 |
|
Rebuilt 55,000 lb/hr. Cleaver Brooks in shop and transported to Mannington/Wellco Corp. Boiler was installed in Calhoun, plant to operate on gas and #6 oil.
|
| Winter 1991 |
|
Provided and installed 35,000 lbs. hr. Combustion Engineering Boiler. We designed conversion of field erected boiler from natural gas to wood fired including firebox design, under fire air system, and ash re-injection system.
|
| Fall 1990 |
|
Provided emergency installation of 800 H.P. Cleaver Brooks Boiler. System installation included setting boiler, steam, gas, feed water and oil piping. Start up of system was completed within 17 hrs. upon delivery of boiler.
|
| Summer 1990 |
|
Provided and installed 35,000 lbs. hr. Combustion Engineering Boiler. We designed conversion from field erected boiler from natural gas to wood fired including firebox design, under fire air system, and ash re-injection system.
|
| Summer 1990 |
|
Rebuilt and installed 600 HP Cleaver Brooks boiler. This project included remote visual monitor 1200 feet away to aid plant personnel in monitoring boiler system.
|
| Spring 1990 |
|
Installed 1100 Ton Trane chiller and related chill water system including four main circulating pumps 75 and 100 horsepower, 3800 feet of 12" chill water piping of which 1600 feet of pipe was 5' underground which was perma-pipe pre-insulated construction.
|
| Winter 1989 |
|
Provided and installed 75,000,000 btu/hr. liquid propane system including 30,000 gallon storage tank, Sam Dick mixer and water bath vaporizer.
|
| Fall 1989 |
|
Provided and installed two 20,000 gallon #6 oil storage tanks, retaining dike and related piping.
|
| Summer 1989 |
|
Complete recasing and rear wall rebuild on a 110,000 lb/hr. Murray steam boiler.
|
| Summer 1989 |
|
Complete emergency rebuild and installation of 5,000,000 btu/hr. Dowtherm Vaporizer. Project completed from start to finish in 2 days.
|
| Summer 1989 |
|
Retube on two 50,000 lb./hr. Erie City boilers located at Plant 1.
|
| Summer 1989 |
|
Complete fabrication and installation of 128' vertical grain transfer elevator.
|
| Winter 1988 |
|
Designed and installed steam,water, starch and air system for new paper corrugator system installation. This project also included 400 H.P. Cleaver Brooks.
|
|
|
|
|
|
|
|
 |
 |